Work Scope
Installation of a 400sqm banner and 2 smaller banners onto the scaffold façade of the construction site via abseil. Anchor points were also installed to allow for safe access.
Client
Dais Construction Media
Outcomes

All 3 banners were installed over a long 2 day period on site. The larger 400sqm banner was craned up to the workers who were positioned on the façade to receive and fix the rolled banner to the scaffolding. Great consideration was given to the weather conditions and maintaining control of the banner as major roads running off the harbour bridge were only metres away. All banners were completed in the time frame allowed and secured evenly across the façade.

View photos of this project >